Validation and verification of medical gas installations

Why is it important to Validate and Verify Medical Gas Installations?

The objective of testing and commissioning is to ensure that all the necessary safety and performance requirements of the MGPS will be met. Testing and commissioning procedures will be required for new installations, additions to existing installations and modifications to existing installations. The scope of work will dictate the specific test programme required.

To learn more click here.

What Validation Tests Should be Carried out?

  • Labelling and marking

  • Sleeving and supports

  • Leakage

  • Cross-connection

  • Leakage

  • Closure of AVSUs and LVAs

  • Zoning of AVSUs and terminal unit identification

  • Cross-connection

  • Flow and pressure drop at individual terminal units

  • As-fitted drawings

  • Purging and filling

  • Particulate contamination

  • Gas quality

  • Gas identification

  • AGS disposal systems

  • Mechanical function and correct installation

  • NIST connectors

  • System performance

  • Supply systems

  • Pressure safety valves

  • Warning and alarm systems